Maximize Your Field Efficiency

Test Drive our Field Service Management Essentials

Maximize Your Field Efficiency - Test Drive our Field Service Management Starter Pack

Click below for an in-depth
preview of the FSM Tool

We’re excited for you to experience the next generation energy platform!

To view the full experience of our product, please head over to your desktop or tablet. If you’re on a smaller screen you can still see W Energy by requesting a demo.

W Energy Field Ops Unplanned Downtime Annual Savings Calculator

How Many Producing Wells do you have?

Total BOED (Estimate)

WTI Crude (Estimate)

Current average downtime %

Est Annual Downtime Loss

$ 51,328,125

Estimated Annual Savings when reducing unplanned downtime by:

0.50%
$256,641
1%
$513,281
2%
$1,026,563
3%
$1,539,844
4%
$2,053,125
5%
$2,566,406

The Field Service Management Value

Transparency


Easily see your work

Speed


Quickly see your schedule

Focus


Prioritize your work to minimize downtime

Smart
Routing


To High Priority Assets

Uninterrupted Field Operations


With offline data capture and sync

Schedule all
Field Work


With efficient execution and follow-ups

What you get in the Starter Pack: Unlimited users, $0 cost per well, and one task template

Innovation is the only way to increase cash flow

Read more how a current customer’s investment in the innovative software solution, W Energy, dramatically increased their cashflow.

Revenue Increase: They attended to distressed, high value assets sooner with W Energy’s Pump By Exception.


Before W Energy, it took the operator 2-3 days to attend to a distressed well producing 20 barrels a day.

2-3 days of downtime meant they were losing 60 barrels of oil every time.

After W Energy they were able to attend to distressed wells in 2-3 hours, there by increasing their oil production.

At $60/barrel*, their revenue boost was significant.

Cost Savings: W Energy enabled them to do more with less in the field.


Field Operators were able to cover a much wider area more efficiently.

At $56/hour, this resulted in significant savings on G & A costs.

Each Operator estimated that they saved 2-3 hours a day with W Energy.

For every 4 operators they had running the field, they were saving 8 man hours; essentially a full work day.